Sud-ovest e Milano

Line: RE2 Milano-Treviglio-Bergamo

Milano-Treviglio-Bergamo cantieri Trenord

 

 

 

Period: 28 July–24 August 

Intervention: reduction of infrastructure capacity on the Milano Lambrate–Pioltello section for maintenance work on the line

Travel solutions: partial reorganisation of railway connections

 

Lines: RE4 Milano Centrale-Domodossola, R23 Milano Porta Garibaldi-Arona-Domodossola

Milano-Domodossola cantieri Trenord

 

 

 

Period: 5–6 April, 24–25 May, 11–12 October, 20–21 December

Intervention: interruption of train circulation between Rho and Gallarate for infrastructure improvement work on the line

Travel solutions:

  • reorganisation of railway connections
  • Rho–Gallarate bus replacement service

Period: 1–4 May, 8–9 November

Intervention: interruption of train circulation between Sesto Calende and Gallarate for infrastructure improvement work on the line

Travel solutions:

  • Sesto Calende–Gallarate bus replacement service
  • reorganisation of railway connections

All the details for the 1-4 May period can be found in Notice 60/2025

Period: 8 June–27 July

Intervention:

  • interruption of train circulation between Arona and Domodossola for maintenance work on the line
  • reduction of infrastructure capacity on the section between Arona and Sesto Calende for further works in Sesto Calende

Travel solutions:

  • Arona–Domodossola bus replacement service
  • reorganisation of railway connections on the Arona–Sesto Calende route

Period: 30 August–13 September

Intervention: interruption of train circulation between Arona and Domodossola for maintenance work on the line

Travel solutions: Arona–Domodossola bus replacement service

Period: 4–5 October

Intervention: interruption of train circulation between Arona and Gallarate for infrastructure improvement work on the line

Travel solutions: Arona–Gallarate replacement service

  • Arona–Gallarate bus replacement service
  • reorganisation of railway connections

Line: RE5 Milano-Varese-Porto Ceresio

mappa milano porto ceresio cantieri Trenord

 

 

 

Period: 5-6 April, 24–25 May, 11–12 October, 20–21 December

Intervention: interruption of train circulation between Rho and Gallarate for infrastructure improvement work on the line

Travel solutions:

  • reorganisation of railway connections
  • Rho–Gallarate bus replacement service

Period: 28 July–24 August

Intervention: interruption of train circulation on the Gallarate–Varese–Porto Ceresio section for infrastructure improvement work on the line

Travel solutions: Gallarate–Varese–Porto Ceresio bus replacement service

Lines: RE6 Milano-Brescia-Verona, R4 Milano-Treviglio-Brescia

Milano-Verona cantieri Trenord

 

 

 

Period: 28 July–24 August 

Intervention: reduction of infrastructure capacity on the Milano Lambrate–Pioltello section for maintenance work on the line

Travel solutions: partial reorganisation of railway connections

Lines: RE7 Como Lago-Saronno-Milano Cadorna, R17 Como Lago-Saronno-Milano Cadorna

Milano-Como Lago cantieri Trenord

 

 

 

Period: 1–4 May

Intervention: interruption of train circulation between Como Camerlata and Como Lago for infrastructure improvement work

Travel solutions: bus replacement service

All the details in Notice 59/2025

Lines: RE8 Milano-Lecco-Sondrio-Tirano

milano-tirano trenord cantieri

 

 

 

Period: 11–13 April, 19–21 December

Intervention: interruption of train circulation between Morbegno and Sondrio/Tirano for maintenance work on the line 

Travel solutions: bus replacement service

Find all the details here: Notice 6/2025

Period: 23–25 May, 6–8 June, 10–12 October, 14–16 November

Intervention: interruption of train circulation between Lecco and Colico for maintenance work on the line

Travel solutions: bus replacement service

Period: 15 June–14 September 

Intervention: interruption of train circulation between Lecco and Tirano for maintenance work on the line

Travel solutions: bus replacement service

 

 

 

Lines: RE11 Milano-Cremona-Mantova

Milano-Mantova cantieri Trenord

 

 

 

Period: January 2024–December 2026 

Intervention: interruption of train circulation between Bozzolo and Mantova for line dualling work 

Travel solutions: Mantova–Bozzolo replacement buses

Find all the details here: Notice 44/2024

Lines: RE13 Milano-Pavia-Alessandria

Milano Pavia cantieri Trenord

 

 

 

Period: 1 June–20 July

Intervention: single-track train circulation between Voghera and Pavia for extraordinary maintenance work on the Po Bridge

Travel solutions: partial reorganisation of railway connections 

Period: 21 July–29 August

Intervention: interruption of train circulation between Voghera and Pavia for extraordinary maintenance work on the Po Bridge

Travel solutions:

  • bus replacement service
  • for the “Treni del mare” Lombardia-Liguria, alternative rail routes

Period: 30 August–28 September

Intervention: single-track train circulation between Voghera and Pavia for extraordinary maintenance work on the Po Bridge

Travel solutions: partial reorganisation of railway connections 

Line: R14 Milano-Carnate-Bergamo

Milano Bergamo cantieri Trenord

 

 

 

Period: 18 March–24 April, 27 April–21 June 

Intervention: longer travel times on the route between Monza and Calolziocorte for scheduled maintenance work

  • 18 March–24 April: suspension of the Arcore stop for trains from Milano to Ponte San Pietro from 5.30 to 15.30 and from 20.30 to 21.30  
  • 27 April–21 June: suspension of the Arcore stop for trains from Ponte San Pietro to Milano

Travel solutions 18 March–24 April: alternative train routes

All details for the period 18 March-24 April in Notice 37/2025

Travel solutions April 27-June 21:

  • replacement service

 All details for the period 27 April-21 June in Notice 61/2025

Period: February 2024–December 2026 

Intervention: interruption of train circulation between Bergamo and Ponte San Pietro for dualling works on the Bergamo–Ponte San Pietro section and at the Bergamo node 

Travel solutions: Bergamo–Ponte San Pietro replacement buses and "point-to-point" services

Lines: R16 Asso-Seveso-Milano Cadorna, S4 Camnago-Milano Cadorna

Milano-Asso cantieri Trenord

 

 

 

Period: 15–18 August

Intervention: interruption of train circulation between Seveso and Camnago for infrastructure improvement work

Travel solutions: bus replacement service 

Lines: R21 Milano-Gallarate-Luino, TILO S30 Cadenazzo-Luino-Gallarate

Luino-Laveno cantieri Trenord

 

 

 

Period: 5-6 April, 24–25 May, 11–12 October, 20–21 December

Intervention: interruption of train circulation between Rho and Gallarate for infrastructure improvement work on the line

Travel solutions:

  • reorganisation of railway connections
  • Rho–Gallarate bus replacement service

Period: 16–18 May

Intervention: interruption of train circulation between Luino and Laveno for maintenance and improvement work on the line

Travel solutions: bus replacement service 

Line: R34 Milano-Pavia-Stradella

Milano-Stradella cantieri Trenord

 

 

 

Period: 6 April–30 May

Intervention: increased travel times on the route due to the track replacement work on the Genoa–Milano Rogoredo line; suspension of the Barbianello stop for trains departing from Milano in the direction of Stradella/Piacenza

Travel solutions: Pinarolo Po–Broni bus replacement service

See details in Notice 48/2025

Period: 1 June–20 July

Intervention: single-track train circulation between Voghera and Pavia for extraordinary maintenance work on the Po Bridge

Travel solutions: partial reorganisation of railway connections 

Period: 21 July–29 August

Intervention: interruption of train circulation between Bressana and Pavia for extraordinary maintenance work on the Po Bridge

Travel solutions: bus replacement service

Period: 30 August–28 September

Intervention: single-track train circulation between Voghera and Pavia for extraordinary maintenance work on the Po Bridge

Travel solutions: partial reorganisation of railway connections 

Line: R38 Milano Greco Pirelli-Lodi-Piacenza

Milano-Piacenza cantieri Trenord

 

 

 

Period: 22–25 May

Intervention: interruption of train circulation between Piacenza and Codogno for extraordinary line maintenance work

Travel solutions: bus replacement service 

Line: XP1 Malpensa Express Milano Cadorna-Malpensa Aeroporto T2

Mxp-Milano cantieri Trenord

 

 

 

Period: 15 April–27 June

Intervention: reduction in infrastructure capacity on the route between Malpensa Airport T1 and T2 due to improvement work; closure of the routes between the two airport stations

Travel solutions:

  • trips on lines XP2 Milano Centrale–Malpensa T2, R28 Milano Centrale-Malpensa T2, TILO S50 Biasca–Bellinzona–Lugano–Varese–Malpensa 
  • for some journeys, SEA shuttle between Terminal 1 and Terminal 2

 

See details in Notice 52/2025

Lines: XP2 Malpensa Express Milano Centrale-Malpensa Aeroporto T2, R28 Milano Centrale-Malpensa Aeroporto T2

Mxp2 - Milano Centrale cantieri | Trenord

 

 

 

Period: 16–20 June

Intervention: interruption of train circulation between Malpensa T1 and Malpensa T2 for maintenance work on the line

Travel solutions: bus replacement service

Lines: S1 Lodi-Milano Passante-Saronno, S13 Pavia-Milano Passante-Garbagnate

 

 

 

Period: 28 July–24 August

Intervention: interruption of train circulation between Milano Bovisa and Milano Rogoredo for maintenance work on the Passante Ferroviario di Milano

Travel solutions: alternative train routes

Line: S5 Varese-Milano Passante-Treviglio

S5 cantieri Trenord

 

 

 

Period: 5-6 April, 24–25 May, 11–12 October, 20–21 December

Intervention: interruption of train circulation between Rho and Gallarate for infrastructure improvement work on the line

Travel solutions:

  • reorganisation of railway connections
  • Rho–Gallarate bus replacement service

Period: 28 July–24 August

Intervention:

  • interruption of train circulation between Gallarate and Varese for infrastructure improvement work on the line
  • interruption of train circulation between Milano Certosa and Milano Rogoredo for maintenance work on the Passante Ferroviario di Milano
  • reduction of infrastructure capacity on the Milano Lambrate–Pioltello section for maintenance work on the line

Travel solutions:

  • Gallarate–Varese bus replacement service
  • reorganisation of the Gallarate–Milano–Treviglio railway connections

Lines: S6 Novara-Milano Passante-Pioltello

S6 cantieri Trenord

 

 

 

 

 

Period: 28 July–24 August

Intervention:

  • interruption of train circulation between Milano Certosa and Milano Rogoredo for maintenance work on the Passante Ferroviario di Milano
  • reduction of infrastructure capacity on the Milano Lambrate–Pioltello section for maintenance work on the line

Travel solutions:

  • reorganisation of Novara–Milano railway connections

Line: S7 Milano-Molteno-Lecco

s7 cantieri Trenord

 

 

 

Period: 28 July–24 August 

Intervention: suspension of railway service on the entire line for infrastructure improvement work

Travel solutions: bus replacement service and alternative routes

Line: S8 Milano-Carnate-Lecco

S8 cantieri Trenord

 

 

 

Period: 18 March–24 April, 27 April–21 June 

Intervention: longer travel times on the route between Monza and Calolziocorte for scheduled maintenance work

  • 18 March–24 April: stops at Osnago and Airuno on the Milano–Lecco routes once every hour, instead of every half hour
  • 27 April–21 June: stops at Airuno and Osnago on the Lecco to Milano routes once every hour, instead of every half hour. Morning rush-hour runs and some evening runs will maintain stops every half hour

Travel solutions:

  • 18 March–24 April: Carnate–Calolziocorte bus replacement service with stops at Osnago, Cernusco, Olgiate and Airuno.

    Notice 37/2025

  • 27 April–21 June: bus replacement service

    Notice 61/2025

Line: S11 Rho-Milano-Como-Chiasso

S11 cantieri Trenord

 

 

 

Period: 16–17 August

Intervention: interruption of train circulation between Camnago and Seregno for maintenance work on the line

Travel solutions:

  • reorganisation of railway connections
  • replacement service